May 31st 2018 - 25b 0 degree port

From New IAC Wiki
Revision as of 18:36, 6 June 2018 by Harpconn (talk | contribs)
Jump to navigation Jump to search

Linac Run Plan April 2018, Dr. McNulty

In chronological order

Pulse Width: 500ns

Beam Current: 50mA

Distance from end of beam pipe: 50cm

Electrons

Shot # Number of Pulses Number of OSLs Total Dose Dose/pulse (Rad) Expected Dose/pulse (Rad)
1 6 1 768.10344 128.017
2 6 1 795.26442 132.544

Shot 3: First array of 16 OSLs

Shot 4: First array of 17 OSLs


Beam retune



Shot # Number of Pulses Number of OSLs Total Dose Dose/pulse (Rad) Expected Dose/pulse (Rad)
5 6 1 1435755.04 239.292
6 2 1 468282.38 234.141
7 4 1 842878.14 210.719
8 5 1 1062993.42 212.598
9 3 1 646637.48 215.545

Graph of pulse vs dose

Average Dose/Pulse: 222.459 Rad

Shots 5-9

Shot 10: Second array of 17 OSLs

Center OSL read 199.121 Rad/Pulse

Averaging with Shots 5 to 9: 218.569 Rad

Photons

Shot # Number of Pulses Number of OSLs Dose/pulse (Rad) (0,0) Expected Dose/pulse (Rad)
11 51948 17
12 52106 17

Photon Array 1

Photon Array 2


Thesis