May 31st 2018 - 25b 0 degree port
Jump to navigation
Jump to search
Linac Run Plan April 2018, Dr. McNulty
In chronological order
Pulse Width: 500ns
Beam Current: 50mA
Distance from end of beam pipe: 50cm
Electrons
Shot # Number of Pulses Number of OSLs Total Dose Dose/pulse (Rad) Expected Dose/pulse (Rad) 1 6 1 768.10344 128.017 2 6 1 795.26442 132.544
Shot 3: First array of 16 OSLs
Shot 4: First array of 17 OSLs
Beam retune
Shot # Number of Pulses Number of OSLs Total Dose Dose/pulse (Rad) (0,0) Expected Dose/pulse (Rad) 5 6 1 1435755.04 239.292 6 2 1 468282.38 234.141 7 4 1 842878.14 210.719 8 5 1 1062993.42 212.598 9 3 1 646637.48 215.545
Graph of pulse vs dose
Average Dose/Pulse: 222.459 Rad
- Shots 5-9
Shot 10: Second array of 17 OSLs
- Center OSL read 199.121 Rad/Pulse
Averaging with Shots 5 to 9: 218.569 Rad
Photons
Shot # Number of Pulses Number of OSLs Dose/pulse (Rad) (0,0) Expected Dose/pulse (Rad) 11 51948 17 12 52106 17