May 31st 2018 - 25b 0 degree port

From New IAC Wiki
Revision as of 20:48, 4 June 2018 by Harpconn (talk | contribs)
Jump to navigation Jump to search

Linac Run Plan April 2018, Dr. McNulty

In chronological order

Pulse Width: 500ns

Beam Current: 50mA

Shot # Number of Pulses Number of OSLs Dose/pulse (Rad) Expected Dose/pulse (Rad)
1 6 1 128.017
2 6 1 132.544





Thesis