LB Feb Soil Information
Target Information
Target#170013-001 was simply soil placed in an aluminum cylinder with a mass of 32.65g, a diameter of 4.5cm and a height of 12cm.
Target 4 | Mass (g) |
Soil Mass | 109.78 |
The soil was collected from the following gps coordinates
Beam Parameters
The sample was irradiated with 250Hz beam with
Amp current. The pulse width was seconds at an energy of 20Mev = 1.44kW. The sample began irradiation at 8:00AM and was irradiated for 8 hours in the rotating sample holder, ending at 16:00 on 2/13/17.radiator description
Calibration
For the xcooler the calibration constants are A = -7.2859 +/- 2.12139, B = 0.500646 +/- 0.00177798
For Detector B the calibration constants are A = 0.491937 +\- 0.392529 and B = 0.808439 +\- 0.000483705
LB April DetB DetA Calibration
Soil Background
Below is a histogram of the soil background spectrum. The measurement was taken on Detector B on 4/24/17.
Below is a histogram of run r5920, which was taken on 2/14/17
Below is a histogram of DetA_PureSoil_5_2_18.root
Photon Spectroscopy Runlist
Date | File | Sample | Time Since Irradiation (s) | Start | Stop | Runtime (S) | Position |
2/14/17 | r5920 | Pure Soil | 116,140 | 12:17:40 | 12:39:59 | 1334 | 9cm From Xcooler |
3/30/17 | r6239 | Pure Soil | 3,928,325 | 15:14:05 | 23:45:46 | 30641 | Detector Face (xcooler) |
4/24/17 | DetB_PureSoil_DetFace_4_24_17.txt | Pure Soil | 6,096,414 | 17:28:54 | 13:24 | 71712.5 | DetB Face |
6/23/17 | DetA_Pure_Soil_6_23_17.txt | Pure Soil | 11,277,086 | 16:33:26 | 09:35:51 | 145739.026 | 10cm (DetA) |
5/2/18 | DetA_PureSoil_5_2_18.txt | Pure Soil | 38,310,420 | 13:49:00 | 12:05 | 80210.115 | 10cm |
5/3/18 | DetA_Background_5_3_18.txt | Background | 14:08:27 | 66954.070 | n/a |
The last 2 data files are in the directory /data/IAC/LB_Thesis_Analysis/Soil_Data on daq1
Below is the time cut information for the 5/2/18 Pure Soil Run
Thorium Rods:0<t<300
Soil: 500<t<RunEnd