09-07-2016
No target collimator open
- Beam Conditions
- 11.1 MeV , 2 ns pulse width
Run # | Configuration |
5277 | 11.1 MeV , 2 ns pulse width , 850 mA , 60 Hz , Collimators wide open , radiator out , Tuning |
5286 | 11.1 MeV , 2 ns pulse width , 850 mA , 200 Hz , Collimators wide open , radiator 3/4" Al , Target is 3/4 thick Al @ 90 degree to beam |
5288 | 11.1 MeV , 2 ns pulse width , 850 mA , 200 Hz , Collimators wide open , radiator Out , Target is 3/4 thick Al @ 90 degree to beam |
528 | 11.1 MeV , 2 ns pulse width , 850 mA , 200 Hz , Accelerator side collimator open, Cell side collimator closed , radiator Out , Target is 3/4 thick Al @ 90 degree to beam, Block cell on accelerator side to measure shower from beam dump with max e- hitting dump |
block cell , 1" radiator | |
unblock cell , install 1" radiator | |
DU cylinder target
- Beam Conditions
- 11.1 MeV , 2 ns pulse width
1” Al radiator, collimator slit open, HV -1700V,*Find lowest thresholds to run.