Niowave 9-2015
Jump to navigation
Jump to search
Progress Report, September 2015
Simulations were performed to predict the efficiency of producing positrons using a Lead-Bismuth target and a 10 MeV incident electron. MCNPX and GEANT4 were used to predict this efficiency in an effort to benchmark the results. Niowave performed a simulation using MCNPX and ISU used GEANT4. A comparison of the positron production efficiency predictions made by MCNPX and G4beamline (GEANT4) is shown in the table below. The two simulation packages appear to be consistent with each other.
PbBi Thickness (mm) | #positrons/million electrons (G4Beamline) | #positrons/million electrons (MCNPX) |
1 | 1138,1154,1097,1159,1125 =1135 | 251091 |
1.5 | 1668,1701,1639, 1644, 1628=1656 | 291728 |
2 | 1937,1930,1851,1874,1945=1907 | 421984 |
3 | 1889,1821,1852,1809,1859=1846 | 321986 |
4 | 1726,1696,1673,1693,1681=1694 | 201858 |
5 | 1566,1543,1546,1625,1566=1569 | 331646 |
6 | 1549, 1486,1564,1545,1452=1520 | 501541 |
7 | 1462,1327, 1407,1489 ,1477=1432 | 671541 |
8 | 1289, 1335,1280, 1271, 1280 = 1291 | 25|
10 | 1141,1241, 1199, 1202, 1148 =1186 | 421216 |
The spatial distributions observed appear below
Electrons and Positrons after 2mm of LBE:
Electrons:
Positrons: