User contributions
Jump to navigation
Jump to search
- 21:50, 7 September 2011 diff hist 0 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:50, 7 September 2011 diff hist +1 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:49, 7 September 2011 diff hist 0 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:46, 7 September 2011 diff hist -2 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:45, 7 September 2011 diff hist +101 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:41, 7 September 2011 diff hist +31 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:38, 7 September 2011 diff hist 0 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:37, 7 September 2011 diff hist -1 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:36, 7 September 2011 diff hist 0 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:36, 7 September 2011 diff hist +8 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:35, 7 September 2011 diff hist +13 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:33, 7 September 2011 diff hist 0 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:33, 7 September 2011 diff hist +94 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:32, 7 September 2011 diff hist 0 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:31, 7 September 2011 diff hist +4 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:31, 7 September 2011 diff hist +48 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:29, 7 September 2011 diff hist +30 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:27, 7 September 2011 diff hist +1 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:26, 7 September 2011 diff hist 0 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:26, 7 September 2011 diff hist 0 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:26, 7 September 2011 diff hist +105 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:24, 7 September 2011 diff hist -33 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:23, 7 September 2011 diff hist +5 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:21, 7 September 2011 diff hist +2 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:20, 7 September 2011 diff hist +1 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:19, 7 September 2011 diff hist +2 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:19, 7 September 2011 diff hist +4 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:18, 7 September 2011 diff hist -6 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:17, 7 September 2011 diff hist +27 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:17, 7 September 2011 diff hist +6 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:16, 7 September 2011 diff hist -38 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:15, 7 September 2011 diff hist +5 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:15, 7 September 2011 diff hist +50 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:13, 7 September 2011 diff hist +29 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:10, 7 September 2011 diff hist +2 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:09, 7 September 2011 diff hist +11 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:07, 7 September 2011 diff hist -22 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:06, 7 September 2011 diff hist +22 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 21:04, 7 September 2011 diff hist +171 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 20:59, 7 September 2011 diff hist +2 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 20:48, 7 September 2011 diff hist +2 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 20:47, 7 September 2011 diff hist +86 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 20:46, 7 September 2011 diff hist +1 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 20:46, 7 September 2011 diff hist +16 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 20:43, 7 September 2011 diff hist +1 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold
- 20:41, 7 September 2011 diff hist -4 September 7, 2011 →By using TDC to count PS pulses (10,000 beam pulses). Beam On. Dump in. Collimator blocked (see lab log books). Radiator out (10 um Al).
- 20:40, 7 September 2011 diff hist +3 September 7, 2011 →By using TDC to count PS pulses (10,000 beam pulses). Beam On. Dump in. Collimator Open. Radiator out (10 um Al).
- 20:40, 7 September 2011 diff hist -62 September 7, 2011 →By using TDC to count PS pulses (10,000 beam pulses). Beam On. Dump in. Collimator blocked (see lab log books). Radiator in (10 um Al).
- 20:40, 7 September 2011 diff hist +67 September 7, 2011 →By using TDC to count PS pulses (10,000 beam pulses). Beam On. Dump in. Collimator Open. Radiator out (10 um Al).
- 20:39, 7 September 2011 diff hist +8 September 7, 2011 →Summary of counting with TDC (10k beam pulses) for different beam line configuration. -150 mV threshold