PosRun 12 09 2013

From New IAC Wiki
Revision as of 17:24, 9 December 2013 by Foretony (talk | contribs)
Jump to navigation Jump to search

In-flight

Run # Run Duration (s) Configuration
6502 min s (54297 pulses) same as above except: REmoved Al brick beam stop

40 MeV on Tungsten

40 MeV electrons are hitting the positron production Tungsten target



Run # Run Duration (s) Configuration
6503 3 min 46 s ( pulses) Dipoles in positron mode. Al Brick in along 8 inch length
6504 min s ( pulses) same as previous run, Al brick OUT
6505 min s ( pulses) same as previous run, Dipoles in Electron mode, R6500-04-05 ch3.png
6506 min s ( pulses) same as previous run, Selection Magnet bending electrons up positioned after 50 micron Ti vacuum window, R6505-06 ch3.png
6507 min s ( pulses) same as previous run, dipoles set to positron mode and selection magnet rotated 180 degrees so positrons bend up,
6508 min s ( pulses) same as previous run:increase voltage from -700 to -850
6509 min s ( pulses) same as previous run, installed 2" thick graphite hardener
6510 min s ( pulses) same as previous run, removed graphite hardener and selection magnet, returned to dipoles in electron mode,



Positrons_Using_40Mev_Linac#10.2F14.2F13