09/23-27/2013

From New IAC Wiki
Revision as of 15:49, 29 September 2013 by Abdehait (talk | contribs) (Created page with "===09/23/13 BeamOn shutter close2.8_3.4kV=== ADC : GEM CH#5, Scintillator 11 TDC: GEM CH#27,31 , Scintillator 29 PS-ADC: GEM CH#15 {| border="1" cellpadding="4" |- |Run Numbe…")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

09/23/13 BeamOn shutter close2.8_3.4kV

ADC : GEM CH#5, Scintillator 11

TDC: GEM CH#27,31 , Scintillator 29

PS-ADC: GEM CH#15

Run Number Beam Start Time End time Notes
6087 on 11:58:23 12:56:30 , ADC does not collect charge from the scintillator 3.4,2.8kV
6088 on 12:56:58 beam on, 3.4,2.8kV
6089 on 13:41:15 14:19:01 , 2.8,2.8kV, run included a beam off then beam on again.
6090 on 14:31:39 14:34:45 3.4,2.8kV
6091 on 14:36:29 15:20:07 43' 38" 3.4,2.8kV
6092 on 15:22:16 15:41:36 19' 20" 3.4,2.8kV
6093 on 15:42:46 16:27:24 44 38" 3.4,2.8kV
6094 on 16:28:28 16:58:48 30' 20" 3.4,2.8kV, high sci. voltage that saturate the ADC, b