09/23-27/2013
Jump to navigation
Jump to search
09/23/13 BeamOn shutter close2.8_3.4kV
ADC : GEM CH#5, Scintillator 11
TDC: GEM CH#27,31 , Scintillator 29
PS-ADC: GEM CH#15
Run Number | Beam | Start Time | End time | Notes |
6087 | on | 11:58:23 | 12:56:30 | , ADC does not collect charge from the scintillator 3.4,2.8kV |
6088 | on | 12:56:58 | beam on, 3.4,2.8kV | |
6089 | on | 13:41:15 | 14:19:01 | , 2.8,2.8kV, run included a beam off then beam on again. |
6090 | on | 14:31:39 | 14:34:45 | 3.4,2.8kV |
6091 | on | 14:36:29 | 15:20:07 | 43' 38" 3.4,2.8kV |
6092 | on | 15:22:16 | 15:41:36 | 19' 20" 3.4,2.8kV |
6093 | on | 15:42:46 | 16:27:24 | 44 38" 3.4,2.8kV |
6094 | on | 16:28:28 | 16:58:48 | 30' 20" 3.4,2.8kV, high sci. voltage that saturate the ADC, b |