12 10 2012 HRRL DetectorTests
12/12/12
Worked on tuning the beam and evaluating the background HRRL_Dec_12_2012Run
12/13/12
Worked on establishing a small spot size on the Phosphorous target and then documenting the beam properties.
Worked on tuning the beam and evaluating the background HRRL_Dec_12_2012Run
Worked on establishing a small spot size on the Phosphorous target and then documenting the beam properties.