10/01/12

Sector 6 - tested SL2 Field wires from row 134 to 168 (245 wires).

Sector 5 - restrung Guard and Field wires for replaced feed throughs in SL1 (Fields: 167-11, 187-2, 223-8 and 225-11. Guards: 227-10 and 228-3).

Sector 1 - began training stringers to turn on high voltage and look for signals using STB probe and ADB monitoring system.