HRRL Positrons Jul 2012 Runs Setup
ADC inputs
Detector Left -> CH6
Detector Right -> CH5
Beam left Scintillator (between Q9 and Q10)-> CH9
Scintillator 1 (right next to the beam exit at the the 90 deg) -> CH2.
Battery -> CH13.
Note: There were some changes going on during the experiment. The above setup was according to the sent up on 27th of Jul. All the changes were recorded.