Tune
Energy Switch | Out (High En) |
Solenoid 1 | 13.9 A |
Solenoid 2 | 4.1 A |
Gun Hor | -0 A |
Gun Ver | +0.2 A |
Output Hor | -0.3 A |
Output Ver | -0 A |
Rep Rate | 17 |
Gun HV | 10 (Knob Setting) |
Gun Grid Voltage | 10 (Knob Setting) |
RF frequency | 2856.315 MHz |
Modulator HV Power Supply | 4.19 (Knob Setting) |
RF macro Pulse Length (FWHM) | 300 ns |
Q1 (A) | -3 |
Q2 (A) | +0 |
Q3 (A) | +2 |
Q4 (A) | 0 |
Q5 (A) | 0 |
Q6 (A) | 0 |
Current at FC0 | 100 mA |
Beam Current Calibration of Scint Left
Determine if the Beam Left Scintillator is linear with beam current.
Determine if the Beam Left Scintillator is linear with beam current.
Beam Current Calibration of Scint Left
Determine if the Beam Left Scintillator is linear with beam current.
1. T1 out, disable D1 (Q4,Q5,Q6 too), send the beam to FC0, take scope image of the area.
2. T1 in, enable D1 (Q4,Q5,Q6 too), bend the beam by 90 deg, take a run with 1000 events.
Energy calibration of Scint 1
With T1 ande T2 out, send 1,2,6, and 10 MeV electrons to Scintillator 1 located at the end of the 90 degree beam line
HV=1300
Resume positron production using 10 MeV eletrons
Insert Gun trigger into VME scaler