201112 R1ProgressRep

From New IAC Wiki
Revision as of 22:52, 9 December 2011 by Llim (talk | contribs) (→‎12/8/11)
Jump to navigation Jump to search

12/1/11

91 wires were strung today.

20111201 Temp1.png

12/2/11

97 wires were strung today. All field wires are strung and the final tensioner has been removed.

20111202 Temp1.png

12/3/11

Weekly trend measurement was done today.

12/5/11

Prior to rotating the chamber, I decided to do a thorough visual inspection to ensure no crossed wires. During this inspection, several wires were found that had kinks in them. These wires were replaced. Tensions were measured also.

Chamber has been rotated. Sense wire stringing has begun.

22 sense wires were strung today.

20111205 Temp1.png

12/6/11

84 sense wires were strung today.

12/7/11

45 sense wires were strung today.

20111207 Temp1.png

12/8/11

72 sense wires were strung today.

20111208 Temp1.png

12/9/11

42 sense wires were strung today.

400 px