September 20, 2011

From New IAC Wiki
Revision as of 14:18, 20 September 2011 by Shaproma (talk | contribs)
Jump to navigation Jump to search

go back

summary what was been done

Run # Beam Dump magnet Collimator add coll Hardener 1" Al Radiator 10 um Al Target Comments
2502 Up
90A
In Open In Yes In DU cylinder Test radiator in/out.

120664 pulses
R(upstream) = 0.0012 e+/pulse
R(downstream) = 0.0272 e+/pulse

2503 Up
90A
In Open In Yes Out DU cylinder Test radiator in/out.

121258 pulses
R(upstream) = 0 e+/pulse
R(downstream) = 0.00091 e+/pulse
About 97% of photons are coming from the radiator according to PS. Very Good

2504 Down
90A
In Open In Yes In DU cylinder Test radiator in/out.

121258 pulses
R(upstream) = 0 e+/pulse
R(downstream) = 0.00091 e+/pulse

} go up
Run # Beam Dump magnet Collimator add coll Hardener 1" Al Radiator 10 um Al Target Comments
2494 Up
90A
In Open In Yes In DU cylinder Long production run

pulses
R(beam down) = n/pulse -> ×180×60 = 6.8 n/min
R(upstream) = = e+/pulse