September 16, 2011
summary what was been done
| Run # | Beam | Dump magnet | Collimator | Hardener | Radiator 25 um Al | Target | Comments | 
|---|---|---|---|---|---|---|---|
| 2459 | Up 90A | In | Open | Yes | Out | DU cylinder | Beam check-in run. R(beam down) = 1/160279 = 0.0000062 n/pulse | 
| 2460 | Down 86A | In | Open | Yes | Out | DU cylinder | Beam check-in run. R(beam down) = 0/160873 = 0 n/pulse | 
| 2461 | Down 86A | In | Open | Yes | Down | DU cylinder | Beam check-in run. R(beam down) = 33/160084 = 0.0002061 n/pulse  -> ×180×60 = 2.2 n/min | 
| 2462 | Up 90A | In | Open | Yes | Up | DU cylinder | Beam check-in run. R(beam down) = 0.000362 n/pulse   -> ×180×60 = 3.9 n/min | 
| 2463 | Up 90A | In | Open | Yes | Up | Out | Beam check-in run. R(beam down) = 0 n/pulse | 
| 2464 | Down 86A | In | Open | Yes | Down | Out | Beam check-in run. Short beam off R(beam down) = 0.000029 n/pulse | 
| 2465 | Down 86A | In | Open | Yes | Down | Out | Beam check-in run. Redoing 2465 R(beam down) = 3/160876 = 0.000019 n/pulse | 
| 2465 | Down 86A | In | Open | Yes | Down | Out | Long production run R(beam down) =  n/pulse |