September 16, 2011
Revision as of 16:42, 16 September 2011 by Shaproma (talk | contribs) (→summary what was been done)
summary what was been done
Run # | Beam | Dump magnet | Collimator | Hardener | Radiator 25 um Al | Target | Comments |
---|---|---|---|---|---|---|---|
2459 | Up 90A |
In | Open | Yes | Out | DU cylinder | Beam check-in run.
R(beam down) = 1/160279 = 0.0000062 n/pulse |
2460 | Down 86A |
In | Open | Yes | Out | DU cylinder | Beam check-in run.
R(beam down) = 0/160873 = 0 n/pulse |
2461 | Down 86A |
In | Open | Yes | Down | DU cylinder | Beam check-in run.
R(beam down) = 33/160084 = 0.0002061 n/pulse |
2462 | Up 90A |
In | Open | Yes | Up | DU cylinder | Beam check-in run.
R(beam down) = 0.000362 n/pulse |
2463 | Up 90A |
In | Open | Yes | Up | Out | Beam check-in run.
R(beam down) = 0 n/pulse |
2464 | Down 86A |
In | Open | Yes | Down | Out | Beam check-in run. Short beam off
R(beam down) = 0.000029 n/pulse |
2465 | Down 86A |
In | Open | Yes | Down | Out | Beam check-in run. Redoing 2465
R(beam down) = 0.000029 n/pulse |