September 13, 2011
summary what was been done
Run # | Beam | Dump magnet | Collimator | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|
2385 | Up 2 mm | In | Open | Out | DU plate | Beam check-in run. Beam hardener off. DU plate 45/45 degree orientation and gammas hit the bottom right corner of plate from upstream view.
R(beam 45 left) = 6/173553 = 0.0000346 n/pulse |
2386 | Up 2 mm | In | Open | Up 2 mm | DU plate | Beam check-in run. 1" of Al hardener in front of upstream radiator.
R(beam 45 left) = n/pulse |
2387 | Up 2 mm | In | Open | Up 2 mm | DU plate | Lost beam |
2388 | Up 2 mm | In | Open | Up 2 mm | DU plate | Beam check-in run. Hardener in as before. Target realignment, now the gammas hit the center of DU plate, which is as before 45/45 degree orientation
R(beam 45 left) = n/pulse |
2389-2395 | Up 2 mm | In | Open | Up 2 mm | DU plate | Detector set-up |
2396 | Up 2 mm | In | Open | Up 2 mm | DU plate | HV on A22 and A24 are -1700V. Detector check run. All setup as before. Radiator in/out test
R(beam 45 left) = 104/216929 = 0.000479 n/pulse |
2397 | Up 2 mm | In | Open | Out | DU plate | Radiator in/out test
R(beam 45 left) = n/pulse |