September 12, 2011
Revision as of 15:27, 12 September 2011 by Shaproma (talk | contribs) (→summary what was been done)
summary what was been done
Run # | Beam | Dump magnet | Collimator | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|
2359 | Centered | In | Open | Out | No | Test radiator in/out
R(upstream) = 157/40244 = 0.0039 e+/pulse, |
2360 | Centered | In | Open | Centered | No | Test radiator in/out
R(upstream) = 898/40244 = 0.0223 e+/pulse, |
2361 | Up 2 mm | In | Open | Up 2 mm | No | Test radiator in/out
R(upstream) = 730/40839 = 0.0179 e+/pulse, |
2362 | Up 2 mm | In | Open | Out | No | Test radiator in/out
R(upstream) = 172/41035 = 0.0042 e+/pulse, |