Wednesday Run Plan
- Tune up beam
- During this time, as much as possible tune up daq timing
- Kicker magnet calibration with viewscreen
- Pair spectrometer checkout/debugging
This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open versus blocked, ...
- Check detector rates with D2O. See if we can get a good time of flight spectrum.
Kicker magnet calibration with viewscreen
Pair-spectrometer threshold calibration with beam
By using analog counter. Beam On. Swip Off. Collimator Open.
By using analog counter. Beam On. Swip Off. Collimator Open.
was not done
By using TDC to count PS pulses (10,000 beam pulses). Beam On. Swip On. Collimator Open.
By using TDC to count PS pulses (10,000 beam pulses). Beam On. Swip On. Collimator blocked (see lab log books).
upstream PS: 150 mV threshold, 19 cnts/10,000 beam pulses downstream PS: 150 mV threshold, 19 cnts/10,000 beam pulses