September 7, 2011
Jump to navigation
Jump to search
Wednesday Run Plan
- Tune up beam
- During this time, as much as possible tune up daq timing
- Kicker magnet calibration with viewscreen
- Pair spectrometer checkout/debugging
This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open versus blocked, ...
- Check detector rates with D2O. See if we can get a good time of flight spectrum.
Pair-spectrometer threshold calibration with cosmic. Beam On. Swip Off. Collimator On. With guys doing beam up and beam down.
File:Thresh downstream beam collim 090711.png : 500px
Pair-spectrometer threshold calibration with cosmic. Beam On. Swip On. Collimator Off.
was not did it