Qweak Commissioning 6-2010
Jump to navigation
Jump to search
Setting Timing
Before running beam we must determine the delay times due to cable length in order to set the latency int he VFAT chips.
These measurements should take place during the May 2010 installation.
Setting Thresholds
During the May install we can set a set of baseline thresholds when there is no beam going into the hall.
This will need to be redone during the commissioning run.