Preliminary setup
3/17/10
Install detector infrastructure to mount 2 Drift chambers, 2 Scintillators and 1 GEM on a translator table.
Install collimation
3/18/10
Install all detectors and associated electronics (power supplies, cabling, gas lines,...)
3/19/10
install DAQ system and associated readout electronics.
Check channels in histograms
Coincidence: Coincidence between Accelerator's RF pulse generator, and several PMTs
TDC start: Accelerator RF pulse generator. TDC stop: 2 DC, 1 GEM trigout, 4 PMTs
ADC: all FC channels from Accelerator ribbon cable. ADC gate: Create timing gate using scope when accelerator
V1495: Trigger pulse from coincidence logic above
3/22/10
Final day for completing system checks
3/23/10
1pm - 5pm: Tune beam for low and high current