NEUPRFP 2009

From New IAC Wiki
Revision as of 20:25, 25 February 2009 by Oborn (talk | contribs) (→‎Guidlines)
Jump to navigation Jump to search

A PDF version of the RFP is given below

Media:NEUP_RFP_2008.pdf


Proposal Due date
March 16,2009


Guidlines

Media:NEUP_Capabilities.pdf

Media:NEUP_Man.pdf

Media:NEUP_narrb.pdf

Media:NEUP_pricing.pdf

Media:NEUP_TE.pdf

Media:NEUP_Teaming.pdf

Go/NoGo requirements

  1. Commitment to reporting
  2. If DOE Lab Work and safety Health program
  3. Export Control
  4. Standard Research Subcontract
  5. Quality Assurance if non-academic partner
  6. commitment to prepare additional contracts

Proposal Outline

Title:

Technical Work Scope and Mission Relevance (20% or 3 pages)

(D.Dale)

Proposed scope description and Scientific Merit (20% or 3 pages)

(D.Dale)

Research Plan Tasks to accomplish scope (35% or 5 pages)

1. establish and commission beamline for polarized photons 2. proof in principle asymm measurement 3. applications: variable targets

(D.Dale)

Milestones and Deliverables

12 months after: acquire beamline components (vacuum pipe for beam dump, beam dump magnet, exit window/pair converter, radiator, 4 PMTs+ bases, octal discriminators, 4-fold logic unit)

24 months after: commission beamline; begin measurements

36 months after: report on measurements with application assessment

R&D resources and Capabilities (10% or 1.5 pages)

HRRL description (with specs and picture) counting room (with picture)

(V.S.- pictures + T.Forest - description)

Timeline

year 1: establish beamline

year 2:

year 3:

(D.Dale)

Roles of Participants and Team Qualifications (15% or 2 pages)

Participant A = D.Dale = Manager Photofission physics

Participant B = V. Starovoitova = Data analysis expert

Participant C = T. Forest = DAQ, beam line design

Participant D = P. Cole = beamline instrumentation, expert complainer


Students = 2 PhD theses + 2 MS theses, 2 undergrad training

Work Scope Challenges and expected innovations

Documentation procedures

Quality Assurance

Budget form

(V.S. + CV)

Proposal Graphs

The time of flight measured by detector A. The unhatched histogram represents the flight time observed when a D2O target is used while the hatched histogram is observed when using the H2O target
overall apparatus
brem target
experimental cell closeup. Need to fix the e+/e- orbits to look the same. One of the particles will remain in the B-field while the other escapes.