5-19-08
Tests of the beam position monitor and the FC using the HRRL
Position tests
Below we see the first signals from the BPM
changed current
Current | scope picture |
80(early) | |
40 | |
80(later) |
changed position
counter clockwise 1 turn
FC performance
Current (mA) | scope picture |
0 | File:Put picture here |
1 | File:Put picture here |
10 | |
30 | |
60 | |
80 |
Rise of table per rotation
MeasurementTurns | h (cm) |
Original position | 10.02 |
10 turns ccw (down) | 9.03 |
10 turns ccw (down) | 7.00 |
10 turns cw (up) | 9.04 |
10 turns cw (up) | 10.04 |
10 turns ccw (down) | 9.05 |
10 turns ccw (down) | 7.00 |
10 turns ccw (down) | 4.94 |
Where "h" is height of table, and "cw" and "ccw" stand for clockwise and counter clockwise respectively.
The average change of height by a turn is 0.19 cm, with standard deviation σ =0.1cm