IAC 1-8-08
Jump to navigation
Jump to search
Signal Cables
HV settings | ||
Cable # | Volts | Desc |
223A10 | Metalica Sense Wire #4 | |
223A11 | Plsstica Sense Wire #4 | |
223A12 | 1105 | PMT Scintillator |
223A13 | 1110 | Middle Scintillator |
223A14 | 1090 | Last Scintillator (Veto) |
223A15 | V260 Scaler Input | |
223A16 | V260 Scaler Input |
Drift Chamber
90/10 ArCo2
Drift Chamber HV
HV settings | ||
Cable # | Volts | Current (ma) |
Sense | 1456 | |
Field | 729 | |
Guard | 731 |
ADC Channel ID
ADC Channel IDs | |
Channel | Desc |
0 | Metalica wire 1 |
1 | Plastica wire 1 |
14 | Front Scint |
15 | Back Scint |
16 | Veto Scint |
Run 297:
First measurement with ADCs. Zero position (beam hitting trumpet).
Run 298:
Move Drift chamber 1 cm (-20,000 on axis 2, 0.4 [inches] left arrow on GUI) away from trumpet.
We had no PMT coincidences (OR was on).
This run should be ignored because table position meter ("Axis-3" MC 2000) was on and that caused noise on PMT signals.
Run 298:
Run 300. gate width: 600ns. PMTs not in ADCs. Timing is around 100 ns out of time. Plastica and Metalica look good.
Run 301: Increase gate width to 1 us. PMTs still in the ADCs. Longer gate width allows for complete integration of the wirechamber ADCs. Signals are better. Position at 1cm from trumpet of feedthrough.