8-10-2017

From New IAC Wiki
Revision as of 22:10, 10 August 2017 by Burgjeff (talk | contribs)
Jump to navigation Jump to search

2nCor_44#Aug_2017

Aug_2017_ChkList#Checklist

Run # Charge/pulse Target Configuration Individual histos + rates Neutron Monitor no top bottom coin. other
6551 Integral= 280 pV*s +-10 peak = 1.1A D2O 10.5 MeV (1113 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 240 Hz R6551.png 230px
6552 Integral= 260 pV*s +-10 peak = 1.1A Al 10.5 MeV (1113 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 240 Hz R6552.png 230px
6553 Integral= 260 pV*s +-10 peak = 1.1A DU-238 R45020 10.5 MeV (1113 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 240 Hz 230px
6554 Integral= 265 pV*s +-10 peak = 1.1A DU-238 R45020 10.5 MeV (1113 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 240 Hz
6555 Integral= 265 pV*s +-10 peak = 1.1A DU-238 R45020 10.5 MeV (1113 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 240 Hz Bad Run - Weird Start
6556 Integral= 270 pV*s +-10 peak = 1.1A DU-238 R45020 10.5 MeV (1113 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 240 Hz
6556 Integral= 265 pV*s +-5 peak = 1.1A DU-238 R45020 10.5 MeV (1110 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 240 Hz prior to run Lemo cable from D330B1.6 to LED was observed to have fallen out of its connector, The HV system control was frozen


Aug_2017_ChkList#Checklist

2nCor_44#Aug_2017