LB May 2017 Irradiation Day

From New IAC Wiki
Jump to navigation Jump to search

DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482


5/23/17

32 MeV Beam 50 mA current after 7 minutes current came up to 80 mA

50% Se Soil Mix

Date Sample Document Title Start Stop Runtime (s) Position
5/23/17 50%Se-Soil DetB Outer Se Det A 50%SeSoil_DetB_OuterSe_DetA_pos10.mpa 09:43:36 23.6cm (DetB) pos10 (DetA)

Beam On:08:48 AM

Beam Off:

Timer to Start Counting:

Timing Cut Information for 50% Se Run (based on real Det B time)

50%SeSoil_DetB_OuterSe_DetA_pos10.mpa

50% Soil Se: Start: 0 Stop: 500 s

Co-60 Flag 1: Start : 500s Stop : 600s

Outer Se : Start 602s Stop: 1000s

Co-60 Flag 2 : Start: 1000s Stop: 1051s

50% Mix : Start: 1051s Stop: 1500s

Co-60 Flag 3: Start: 1500s Stop:


32 MeV Beam 50 mA current 180Hz 2.2 us