LB May 2017 Irradiation Day
Jump to navigation
Jump to search
32 MeV Beam 35 uA current Pulse Width 2.2 us
DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482
5/23/17
50% Se Soil Mix
Date | Sample | Document Title | Start | Stop | Runtime (s) | Position |
5/23/17 |
Beam On:
Beam Off:
Timer to Start Counting:
Timing Cut Information for 50% Se Run (based on Det B time)