05-3-2017

From New IAC Wiki
Revision as of 13:16, 3 May 2017 by Burgjeff (talk | contribs) (Created page with " ''' Electronics map for the two auxiliary scintillators ''' {| border="1" style="text-align: center" ! Phi Angle (Degrees) !! PMT distance !! Signal cable label !! HV cable …")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Electronics map for the two auxiliary scintillators

Phi Angle (Degrees) PMT distance Signal cable label HV cable label HV channel on Lecroy Mainframe CFD CH VNIM-ECL channel ROOT variable
~282 m 102B1.2 shv1.2 5:L1.2 1 (left) B-0 evt.TDC[1][25]
~282 m 282T1.7 shv1.7 5:L1.7 2 (left) B-1 evt.TDC[1][26]


run list

He-3 timing is in patch panel 223A16, & energy is 223A17.

High voltage & discriminator settings:

30T: 1450;30 , 30B:1450;30 , 54T: 1500;30 , 54B: 1500;30 , 78T:1500;30 , 78B: 1525;30 , 126T: 1500;30 , 126B: 1500;30 , 150T: 1500;40 , 150B: 1500;40 , 210T: 1500;40 , 210B: 1500;40 , 234T: 1500;30 , 234B: 1500;30 , 258T: 1350;30, 258B: 1450;30 , 306T: 1400;30 , 306B: 1400;30 , 330T: 1450;30 , 330B: 1500;30

Radiator 1.5" Al.

Slits currently at 500 => 19 mm, at 75 =0, at 1000=38 mm, readback number is linear with slit width.

Small aux. scintillators have a CFD threshold of 0.550 V for run 6274 and later.

Run # Charge/pulse Target Configuration Individual histos + rates overlayed histos All PMT's no coinc.
6286 11. pV*s Empty 10.6 MeV (1123 Gauss) , 3 ns FWHM pulse width , 1.4 A Peak , 180.4 Hz , Removed small Scint at .725 m Kept Scint in at 1.45 m,


2nCor_44#Run_Plan