09-07-2016

From New IAC Wiki
Revision as of 13:11, 7 September 2016 by Burgjeff (talk | contribs)
Jump to navigation Jump to search

Draft run plan

No target collimator open DU cylinder target, 1” Al radiator, collimator slit open, HV -1700V,

  • Find lowest thresholds to run.

(3)Study forward detector gamma flas with Pb curtains (4)Thorium strip, collimator squeeze down. (5)No target run (6)Determine how many fissions per pulse. (7)run 1 mg HEU to see (probably miserable) rates (8)Exploratory measurements with 47% HEU. (9) CFD studies (10)P.S. sweep magnet in/out (11) Long run on Thorium (12) Long run on 1 mg HEU