In-flight
Run # |
Run Duration (s) |
Configuration
|
6502 |
min s (54297 pulses) |
same as above except: REmoved Al brick beam stop
|
40 MeV on Tungsten
40 MeV electrons are hitting the positron production Tungsten target
Run # |
Run Duration (s) |
Configuration
|
6503 |
3 min 46 s ( pulses) |
Dipoles in positron mode. Al Brick in along 8 inch length
|
6504 |
min s ( pulses) |
same as previous run, Al brick OUT
|
6505 |
min s ( pulses) |
same as previous run, Dipoles in Electron mode,
|
6506 |
min s ( pulses) |
same as previous run, Selection Magnet bending electrons up positioned after 50 micron Ti vacuum window,
|
6507 |
min s ( pulses) |
same as previous run, dipoles set to positron mode and selection magnet rotated 180 degrees so positrons bend up,
|
6508 |
min s ( pulses) |
same as previous run:increase voltage from -700 to -850
|
6509 |
min s ( pulses) |
same as previous run, installed 2" thick graphite hardener
|
6510 |
min s ( pulses) |
same as previous run, removed graphite hardener and selection magnet, returned to dipoles in electron mode,
|
Positrons_Using_40Mev_Linac#10.2F14.2F13