HRRL Dec 14 2012Run
Revision as of 16:43, 17 December 2012 by Setisadi (talk | contribs) (→electron beam 90 deg delivery to radiate the glass)
Run Plan
1.) Re-establish an electron beam with an energy >= 12 MeV so the OTR image is visible.
2.)tune a beam spot onto the phosphorous target which is wider in the horizontal direction to account for the 45 degree angle of the screen with respect to the incident beam. Spot size should be less than 1 cm.
Emittance Measurement
electron beam 90 deg delivery
electron beam 90 deg delivery to radiate the glass
Energy Switch | Out (High En) |
Solenoid 1 top | 3.4 A |
Solenoid 2 bottom | 4.1 A |
Gun Hor | -0.2 A |
Gun Ver | +0.1 A |
Output Hor | +0.2 A |
Output Ver | -0.1 A |
Rep Rate | 31 Hz |
Gun HV | 10 (Knob Setting) |
Gun Grid Voltage | 9.55 (Knob Setting) |
RF frequency | 2856.221 MHz |
Modulator HV Power Supply | 4.16 (Knob Setting) |
RF macro Pulse Length (FWHM) | 200 ns |
Q1 (A) | 0 |
Q2 (A) | 0 |
Q3 (A) | 0 |
Q4 (A) | 0 |
Q5 (A) | 0 |
Q6 (A) | 0 |
D1 (A) | 21.1 (11.7257 MeV) |
Q7 (A) | -9 |
D2 (A) | 20.5 (11.0650 MeV) |
Q8 (A) | 0 |
Q9 (A) | 2.0 |
Q10 (A) | 2.7 |