HRRLPos Timeline Summary

From New IAC Wiki
Revision as of 03:04, 17 October 2011 by Foretony (talk | contribs)
Jump to navigation Jump to search
Completion Date IAC Task
1/11? 2 weeks ($10k) IAC engineers install beam line
3/30/11 Order Gate Valve (4 week lead time)
4/4/11 Complete Beam Line CAD drawing (J. Ellis)
4/11/2011 2 weeks ($10 k) Built beam pipe and flanges (Kevin?)
4/18/2011 2 weeks ($10k) Chad builds 4 stands
7/2011 3 days ($1k) Removed and reinstall Gun for alignment (Chad)
8/2011 Zero degree beam line aligned (Khalid, Sadiq)
1/25/2012 Target Motor from Empire Magnetics
1/25/2012 1 week ($5k) Target Chamber design (IAC engineer)
1/25/2012 Target Tungsten disks
2009-2012 $30 k 3 weeks of beam time

IAC investment: $66k

Indirects from DOE : IAC personnel salary paid : $80k

Although not requested, magnet power supplies and a LabView control interface were installed by Chad. We were planning on using the old blue power supplies from the airport.

Positrons#HRRL_beam_Line_installation