September 21, 2011
Beam Parameters:
- current 140 mA
- pulse width 2 us
- rep rate 180 Hz
- E = 25 MeV
Initial Test for Verification
| Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments | 
|---|---|---|---|---|---|---|---|---|
| 2515 | Up 90A | In | Open | In | Yes | Out | DU cylinder | Test radiator in/out. 144632 pulses | 
| 2517 | Up 90A | In | Open | In | Yes | In | DU cylinder | Test radiator in/out. 0 pulses | 
| 2519 | Down 86A | In | Open | In | Yes | In | DU cylinder | Test radiator in/out. 0 pulses | 
| 2520 | Down 86A | In | Open | In | Yes | Out | DU cylinder | Test radiator in/out. 162652 pulses | 
Production Runs
| Run # | Beam | Dump magnet | Collimator | add coll | Hardener 1" Al | Radiator 25 um Al | Target | Comments | 
|---|---|---|---|---|---|---|---|---|
| 2521 | Up 90A | In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (60 minute run) Operator said the beam is really jittery | 
| 2522 | Up 90A | In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (90 minute run) Operator said the beam is really jittery | 
| 2523 | Down 86A | In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (-- minute run) R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min =  -- n/min | 
| 25-- | Up 90A | In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (-- minute run) Operator said the beam is really jittery | 
| 25-- | Down 86A | In | Open | In | Yes | In | DU cylinder | Long production run: -- pulses (-- minute run) R(bottom) = -- n/pulse -> × 180 Hz × 60 sec/min =  -- n/min | 
| 25-- | Down 86A | In | Open | In | Yes | Out | DU cylinder | Long production run: -- pulses (-- minute run) R(bottom) = -- n/pulse ->  × 180 Hz × 60 sec/min =   -- n/min | 
| 25-- | Down 86A | In | Open | In | Yes | In | None | Long production run: -- pulses (-- minute run) R(bottom) = -- n/pulse ->  × 180 Hz × 60 sec/min =   -- n/min |