September 16, 2011
summary what was been done
Run # | Beam | Dump magnet | Collimator | Hardener | Radiator 25 um Al | Target | Comments | ||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
2459 | Up 90A |
In | Open | Yes | Out | DU cylinder | Beam check-in run.
R(beam down) = 1/160279 = 0.0000062 n/pulse | ||||||
2460 | Down 86A |
In | Open | Yes | Out | DU cylinder | Beam check-in run.
R(beam down) = 0/160873 = 0 n/pulse | ||||||
2461 | Down 86A |
In | Open | Yes | Down | DU cylinder | Beam check-in run.
R(beam down) = 33/160084 = 0.0002061 n/pulse -> ×180×60 = 2.2 n/min | ||||||
2462 | Up 90A |
In | Open | Yes | Up | DU cylinder | Beam check-in run.
R(beam down) = 0.000362 n/pulse -> ×180×60 = 3.9 n/min | ||||||
2463 | Up 90A |
In | Open | Yes | Up | Out | Beam check-in run.
R(beam down) = 0 n/pulse | ||||||
2464 | Down 86A |
In | Open | Yes | Down | Out | Beam check-in run. Short beam off
R(beam down) = 0.000029 n/pulse | ||||||
2465 | Down 86A |
In | Open | Yes | Down | Out | Beam check-in run. Redoing 2464
R(beam down) = 3/160876 = 0.000019 n/pulse | ||||||
2466 | Down 86A |
In | Open | Yes | Down | DU cylinder | Long production run
R(beam down) = 243/972019 = 0.00025 n/pulse -> ×180×60 = 2.7 n/min | ||||||
2467 | Up 90A |
In | Open | Yes | Up | DU cylinder | Long production run
R(beam down) = 292/972017 = 0.0003 n/pulse -> ×180×60 = 3.2 n/min | ||||||
2468 | Up 90A |
In | Open | Yes | Out | DU cylinder | Long production run
R(beam down) = 0/162265 = 0 n/pulse | ||||||
2469 | Up 90A |
In | Open | Yes | Out | DU cylinder | Long production run. Bean was turned up a little by operator's view screen.
R(beam down) = n/pulse | ||||||
Removed dump magnet and recalibrate beam | Up 90A |
In | Open | Yes | Out | DU cylinder |