September 13, 2011
Revision as of 14:57, 13 September 2011 by Shaproma (talk | contribs) (→summary what was been done)
summary what was been done
Run # | Beam | Dump magnet | Collimator | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|
2385 | Up 2 mm | In | Open | Out | DU plate | Beam check-in run. Beam hardener off.
R(beam 45 left) = 6/173553 = 0.0000346 n/pulse |
2386 | Up 2 mm | In | Open | Up 2 mm | DU plate | Beam check-in run. 1" of Al hardener in front of upstream radiator.
R(beam 45 left) = n/pulse |