Run # | Beam | Dump magnet | Collimator | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|
2385 | Up 2 mm | In | Open | Out | DU plate | Beam check-in run
R(beam 45 left) = 6/173553 = 0.0000346 n/pulse |
2386 | Up 2 mm | In | Open | Out | DU plate | Beam check-in run
R(beam 45 left) = n/pulse |