September 13, 2011
Revision as of 14:48, 13 September 2011 by Shaproma (talk | contribs) (→summary what was been done)
summary what was been done
Run # | Beam | Dump magnet | Collimator | Radiator 10 um Al | Target | Comments |
---|---|---|---|---|---|---|
2385 | Up 2 mm | In | Open | Out | DU plate | Beam check-in run
R(beam 45 left) = 475/583758 = 0.00081 n/pulse |