September 7, 2011
Jump to navigation
Jump to search
Wednesday Run Plan
- Tune up beam
- During this time, as much as possible tune up daq timing
- Kicker magnet calibration with viewscreen
- Pair spectrometer checkout/debugging
This should include setting thresholds, studying rates with air converter, looking at rates with photon hole open versus blocked, ...
- Check detector rates with D2O. See if we can get a good time of flight spectrum.
Kicker magnet calibration with viewscreen
Pair-spectrometer threshold calibration with beam
By using analog counter. Beam On. Swip Off. Collimator Open.
By using analog counter. Beam On. Swip On. Collimator Open.
was not done