FC calibration 25 MeV 3/4/11

From New IAC Wiki
Revision as of 15:37, 2 June 2011 by Shaproma (talk | contribs)
Jump to navigation Jump to search

Go Back


Below is the FC calibration by using view screen observation for 44 MeV setup (runs 1848-1867)

FC Calibration 3.4.11.png


Here are:

  1. red line is the fitting line for beam up
  2. green line is the fitting line for beam down
  3. black line is the fitting line for beam up and down

We can see that all three line is almost the same so we can use the fitting line for whole range of kicker magnet which is

[math]x(cm)= 0.059 + 0.028\cdot I(Ampers)[/math]


Go Back