| Date |
Run Number |
Comment
|
| 3/4/11 |
1831 |
25 MeV FC test, see scope picture #46
|
| 3/4/11 |
1832 |
FC test, 3mm vertical Al collimation in front of FC
|
| 3/4/11 |
1834 |
FC 9V battery test on each channel
|
| 3/4/11 |
1835 |
FC test with beam-on same results as run 1832
|
| 3/4/11 |
1836 |
FC test bending beam down with 0-100A
|
| 3/4/11 |
1837-47 |
FC Calibration beam down 10A step size (need to move FC up)
|
| 3/4/11 |
1848-57 |
FC Calibration beam down 10A step size
|
| 3/4/11 |
1858-67 |
FC Calibration beam up 10A step size
|
| 3/4/11 |
1868-9 |
Dr. Dale's collimation, no results laying Al bricks horizontally
|
| 3/4/11 |
1870 |
Dr. Dale's collimation, weird results
|
| 3/4/11 |
1871-2 |
Dr. Dale's collimation works
|
| 3/4/11 |
1873-5 |
Wedged Dr. Dale's collimation and swept beam using kickers
|
| 3/4/11 |
1877-98 |
Kicker Magnet calibration using view screen
|
| 3/4/11 |
|
|
| 3/4/11 |
|
|
| 3/4/11 |
|
|
| 3/4/11 |
|
|
| 3/4/11 |
|
|
| 3/4/11 |
|
|