Qweak
Approved with A rating at JLAB for 198 "PAC" days at 150
A. The current need 223 "PAC" days for 5% measurmentComplete work and be ready for beam before October 20. Drop Dead date is November 1.
Physics
Normalization BPM response structure : https://qweak.jlab.org/elog/Beam/45
Hardware
Nauvoo: Missouri
Manasseh: 12th tribe
Collimator
Rotator
Ionization Chamber
Readout Electronics
Software
Qweak online monitoring plots
http://qweak.jlab.org/onlineRegression/autoA/plots/
Management
Required Shifts
According to the Qweak shift policy of April 17, 2009:
"Set a goal for shifts to be staffed by institution, based on 30 shifts per collaborator at the institution, with the expectation that most institutions will provide more than this goal. "
Shift weights
One “Swing” shift (4pm-midnight) counts as 1.0 shifts: “Day” (8am-4pm) shifts count as 0.8 shifts, and “Owl” shifts (midnight-8am) count as 1.2 shifts towards the institutional goal.
Tforest shifts
Sign up using the link below
https://www1.jlab.org/mis/apps/physics/hallCShifts/index.cfm
Qweak shifts taken | |
Dates | # of Shifts |
Nov. 21-23, 2010 | 3 |
Dec. 13-17, 2010 | 5 |
Mar. 22-25, 2010 | 4 |
Total # of shifts = 12 Weighted # of shifts = 9.6 Shifts remaining: 20.4
30 shifts are expected
Qweak_Installation
Conference Call Number
Domestic Dial In Number: (800) 377-8846
Canada Dial In Number: (888) 276-7715
International Dial In Number (302) 709-8424
PARTICIPANT CODE: 08935091
Qweak thesis topics and students
http://qweak.jlab.org/doc-private/ShowDocument?docid=527
Beam Tests
Readout tasks before beam test.
1.) Use the V1495 to record the VFAT test pattern
2.) create a method of displaying the hit pattern visually
3.) Adjust the VFAT threshold to determine noise level using cosmics, then repeat after installation in the HRRL experimental cell
4.) Determine if there are any clock frequency limitations to operation (too slow/too fast,...)
5.) Change VFAT threshold to determine dependence on hit pattern ionization radius.