Qweak R1 Proj Management
Project Leaders
Detector and Front End Electronics
Back End Electronics and Rotator
Man Power
JLAB tests
The hope is to test the R1 detector during the Summer of 2009 at JLAB with a setup identical to what will be used in the Hall. This means having the all cables in place (with the proper lengths) to test timing. We need CODA setup with a VME crate that has a V1495 in it for readout. We need the scintillator for triggering. Paul King won't be available until after Mid June.
Commissioning shifts
These shifts wil take place during the Qweak comissioning phase (5/10)
- Tracking shifts
- Writing the tracking document for shift takers.
Timeline
Date Milestone Description