CLAS12 R1
Jump to navigation
Jump to search
R1 Construction preparations
1.) Budget
2.) Clean room
3.) hiring timeline
9/08 NSF proposal submission
4.) stringing platform and DC stringing support arm
5.) Manpower
6.) MOU to support post doc request or faculty release time
7.)
A few pictures ff the R1 fullo size proto type from my JLab visit on 9/16/07. It is about 6 feet tall.
CLAS12_R1_Prototype_9-16-07
The air actuated crimping tool: