PAS Feasibility Preliminary Runs

From New IAC Wiki
Jump to navigation Jump to search

This experimental setup does not contain BorAl

General run plan

  • Run source in and source out in experimental setup and background subtract with NaI
  • Move the source to different locations along the source tunnel and plot the different distances and count rates
  • Run source in and source out in experimental setup and background subtract with He3
  • Move the source to different locations along the source tunnel and plot the different distances and count rates

I will upload some models of the setup when I have updated the model to include the source and detector

7/19/21

NaI Detector, 5mV threshold, +1000V on detector, no converter

Source Distance (cm) Counts Run Time (s) Count Rate (Hz) Uncertainty
39.5 1563 100
35 1631 100
30 1791 100
25 2054 100
20 2514 100
15 3375 100
10 6182 100

NaI Detector, 5mV threshold, +1000V on detector, with converter

Source Distance (cm) Counts Run Time (s) Count Rate (Hz) Uncertainty
39.5 1489 100
35 1581 100
30 1729 100
25 1936 100
20 2401 100
15 3249 100
10 5969 100

NaI Detector, 2mV threshold, +1000V on detector, no converter

Source Distance (cm) Counts Run Time (s) Count Rate (Hz) Uncertainty
39.5 2039 100
35 2228 100
30 2546 100
25 2960 100
20 3939 100
15 5349 100
10 10050 100

NaI Detector, 2mV threshold, +1000V on detector, with converter

Source Distance (cm) Counts Run Time (s) Count Rate (Hz) Uncertainty
39.5 2071 100
35 2225 100
30 2430 100
25 2825 100
20 3391 100
15 4861 100
10 9576 100




PAS Feasibility Study Runs