PAS Feasibility Preliminary Runs

From New IAC Wiki
Jump to navigation Jump to search

This experimental setup does not contain BorAl

General run plan

  • Run source in and source out in experimental setup and background subtract with NaI
  • Move the source to different locations along the source tunnel and plot the different distances and count rates
  • Run source in and source out in experimental setup and background subtract with He3
  • Move the source to different locations along the source tunnel and plot the different distances and count rates

I will upload some models of the setup when I have updated the model to include the source and detector

7/19/21

NaI Detector, 5mV threshold, +1000V on detector

Source Distance from Intersection (cm) Counts Run Time (s) Count Rate (Hz) Uncertainty
39.5





PAS Feasibility Study Runs