Date
85 useable OSLs
Machine: 24b Linac
Beam Energy: 8 MeV
Rep Rate: Max (180Hz)?
Shot # Start Time End Time Number of OSLs Distance to end of beampipe Beam Current Aluminum Brick Background Subtracted PMT Counts 1 7am 7:15am 1 25cm amps Out 2 7:20am 7:35am 1 25cm amps Out 3 7:40am 7:55am 1 25cm amps Out 4 8:00 8:20 1 25cm amps Out 5 1 25cm amps Out 6 1 25cm amps In 7 1 25cm amps In 8 1 25cm amps In 9 1 25cm amps In 10 1 25cm amps In 11 10 25cm amps Out 12 10 25cm amps Out 13 10 25cm amps Out 14 10 25cm amps Out 15 10 25cm amps Out 16 10 25cm amps In 17 15 25cm amps In
Calculations
Assuming
and a pulse width ofThen
Started a simulation for 1000 times less e- (~62mil) than in one pulse to give some sort of estimate for dose per pulse. Sim started at 11:54pm Thursday April 12th