2nCor_44#Aug_2017
Aug_2017_ChkList#Checklist
Run # |
Charge/pulse |
Target |
Configuration |
Individual histos + rates |
Neutron Monitor |
no top bottom coin. |
other
|
6619 |
Integral= 260+-5pV*s peak = 1.1A |
MT |
10.5 MeV (1110 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 240 Hz. |
|
|
|
|
6620 |
Integral= 240+-5pV*s peak = 1.1A |
Al |
10.5 MeV (1110 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 240 Hz. |
|
|
|
|
6621 |
Integral= 255+-10pV*s peak = 1.1A |
D2O |
10.5 MeV (1110 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 240 Hz. |
|
|
|
|
6622 |
Integral= 240+-5pV*s peak = 1.1A |
Thorium |
10.5 MeV (1110 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 240 Hz. |
|
|
|
Ran out of disk space after approximately an hour
|
6623 |
Integral= 300+-5pV*s peak = 1.1A |
Thorium |
10.5 MeV (1109 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 240 Hz. |
|
|
|
|
6623 |
Integral= 300+-5pV*s peak = 1.1A |
Thorium |
10.5 MeV (1109 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 240 Hz. |
|
|
|
|
6625 |
Integral= 290+-10pV*s peak = 1.1A |
DU |
10.5 MeV (1109 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 240 Hz. |
|
|
|
Fake Neutrons possible, operators minmized 60 ns pulse during run
|
6626 |
Integral= 315+-5pV*s peak = 1.1A |
DU |
10.5 MeV (1109 Gauss) , 3 ns FWHM pulse width , 1.1 A Peak , 240 Hz. |
|
|
|
Stopped after 40 minutes to allow Chad to adjust CO2 gas pressure (had dropped to about 13 psi)
|
Aug_2017_ChkList#Checklist
2nCor_44#Aug_2017