LB May 2017 Irradiation Day

From New IAC Wiki
Revision as of 14:17, 23 May 2017 by Brenleyt (talk | contribs)
Jump to navigation Jump to search

32 MeV Beam 100 mA current Pulse Width 2.2 us

DetB Calibration is A = -2.8392 +/- 0.592828 , B = 0.815444 +/- 0.000630482


50% Se Soil Mix

Date Sample Document Title Start Stop Runtime (s) Position
5/23/17

Beam On:

Beam Off:

Timer to Start Counting:

Timing Cut Information for 50% Se Run (based on Det B time)